• Home
  • Technology
  • Production Process

2016 Summer Collection

Flooring Process

We emphasize the importance of quality in every aspect of our business operations.

 

Professional Flooring Production

"For every demand an adequate plan with our 41 production processes to produce high quality Multi layer Engineered wood Flooring."


1. Logs management in compliant to PEFC

1. Logs management in compliant to PEFC

2. Logs QC

2. Logs QC

3. Logs classification

3. Logs classification

4. Logs cutting

4. Logs cutting

5. Cut Logs Segregation

5. Cut Logs Segregation

6. Softening

6. Softening

7. Peeling

7. Peeling

8. Rotary Cut

8. Rotary Cut

9. Cut to length

9. Cut to length

10. Anti termite process

10. Anti termite process

11. Drying

11. Drying

12. Drying Moisture is checked regularly at 8-10%

12. Drying Moisture is checked regularly at 8-10%

13. Open Carton Inspection Before Delivery

13. Open Carton Inspection Before Delivery

14. Short core / long core assembly

14. Short core / long core assembly

15. Short core / long core assembly

15. Short core / long core assembly

16. Putty & filling

16. Putty & filling

17. Long core short core –cross setting

17. Long core short core –cross setting

18. QC - Pre Glue

18. QC - Pre Glue

19. Glue applied per sqm is 180 gm

19. Glue applied per sqm is 180 gm

20. Cold press

20. Cold press

21. Hot press

21. Hot press

22. Core substrate curing

22. Core substrate curing

23. Veneer selection

23. Veneer selection

24. Face veneer cut to size

24. Face veneer cut to size

25. Face veneer classification

25. Face veneer classification

26. Face veneer QC

26. Face veneer QC

27. Glue is applied on the core at 180 gm/sqm

27. Glue is applied on the core at 180 gm/sqm

28. The assembled face / core goes for cold pressing before steam press

28. The assembled face / core goes for cold pressing before steam press

29. 24 hours cooling process

29. 24 hours cooling process

30. Sanding The board goes through bottom sanding / Weighing

30. Sanding The board goes through bottom sanding / Weighing

31. Face / Core Lamination QC

31. Face / Core Lamination QC

32. Check thickness of sanded plank

32. Check thickness of sanded plank

33. Profiling – T&G

33. Profiling – T&G

34. Profiling QC

34. Profiling QC

35. Finishing

35. Finishing

36. Finishing QC

36. Finishing QC

37. Finished product classification

37. Finished product classification

38. Grading QC

38. Grading QC

39. Packing

39. Packing

40. Warehouse – stock in

40. Warehouse – stock in

41. Open carton inspection before delivery

41. Open carton inspection before delivery